grand haven

This log home had severe rot with a ant infestation in the lowers logs. The rotted logs and sub-floor had to be replaced. The original log supplier was used to keep this log cabin as original as possible. Total completion time was 7 days. Stripping and staining will be done later this summer to complete the restoration of this log cabin.

See more projects

Grand Haven Stain gallery